BIM and 2022 World Cup Final Stadium in Quatar

A very interesting article about the usage of BIM for design, construction and operation of a football stadium for the finals of the 2022 World Cup in football in Qatar. Using efficient BIM methods, 40% of investment costs out of the total of £ 2 billion were saved. BIM enabled cooperation of many offices worldwide, leveraged process and data automation = minimizing human error, and worked with a total of 389 3D separate models combined into one, including overall profession coordination, workflow and individual collisions.

You can read the entire article here

تواصلوا معنا

أنظمة التحول الرقمي ، s.r.o.

Adresa:
Rybná 716/24, 110 00 Praha 1, Česká republika
Kanceláře:
Rybalkova 1433/14, Praha 2 - Vinohrady, Česká republika
Milan Moravec البريد الإلكتروني milan.moravec@digitalsystems.cz
الهاتف +420 721 472 059
Jakub Tůma البريد الإلكتروني jakub.tuma@digitalsystems.cz
الهاتف +420 604 705 191
Ondřej Motl البريد الإلكتروني ondrej.motl@digitalsystems.cz
الهاتف +420 723 322 382
IČ: 08725616
تم تسجيل الشركة في المحكمة البلدية في براغ - C 32464.